This project includes but is not limited to; Public Address System replacement, Lighting Controller replacement, Vestibule Roof Replacement, Main Entry Door replacement, HVAC Air Handler upgrade, Domestic Hot Water upgrades, window replacement, door replacement, Lighting replacement. Cost: $625,447.44
Active
Construct Vehicle Storage Building Shiloh Readiness Center
This project includes the construction of a four-bay vehicle storage building, 36’ x 74’, with single slope standing seam metal shed roof. Site utilities and pavement work are required. The project also includes all electrical, lighting, tube heaters, and ventilation. Cost: $422,133.00
Renovations to Wilson Park Ice Rink and Recreation Center, Granite City
This project consists of a one-story 59’x32’ addition to the existing recreation center, a 8’x59’ covered walkway and a concrete patio with a fire pit. The addition will house a multi-purpose room and 4 dressing rooms. Cost: $235,000.00